Design Drawings

These design drawings document the existing conditions, and the design proposal.

For this project, we consulted engineers for the framing plans and structural details required.

This customer wanted to pursue construction at a later date, and didn’t want to establish the permit at this point.  Once a building permit is issued, you need to close the permit within 18 months in order to avoid additional fees.

 

If you need drawings for a building permit, Design Scales help!  Contact us for a quote.

Thanks for checking out our content! You can leave your comments here.